RNM Inside
Third photovoltaic system successfully installed

31. October 2024

Sustainability at the Reismühle Nutrex:

Since 2011, Reismühle has been focussing on renewable energy sources in order to reduce our ecological footprint and make the site in Brunnen more sustainable. The first photovoltaic system was installed back then and another followed in 2021. This year, Coop Immobilien proudly commissioned our third system on the silo! With a total output of 400 kWp, we now cover around a third of our electricity needs directly on site. We are also sustainably positioned in terms of hot water production: A solar collector system has been supplying our social area with hot water since 2012.



Zurück zur Übersicht